Recover project for a La Conner marine boat yard
JLI has an “Installation Team” experienced in Fabric Structure construction. The recover project is 60 feet wide by 120 feet long. The installation required 2 cranes to raise and drape the cover over the building. The JLI team completed the recover in 3 weeks.

SDOT Fabric Structure installation
JLI was responsible for Permits, Layout, Ecology Block Erection, Truss and cover Installation. The project took 2 weeks from start to finish. The building is 40′ x 50′. This will be used for Seattle Department of transportation, bulk material storage.

Port of Everett Marina slip covers
Over head covers were installed to protect high value yachts and equipment from condensation and rust.